Sunday, October 9, 2016

Project BBR2,Earthworks & Detention Pond.

The client : Sime Darby USJ Sdj Bhd
Contractor: Iswarabena Sdn Bhd
Site Possession Date: 14/6/2016

ESCP 
Earth drain from sediment basin to discharge outlet
Laying geotextile & approved beach sand works for soil improvement
Soil improvement works..
Prefabricated Vertical Drain Works (PVD)
1st layer of earthfill works
Piling works..
RC pile 

KT By Pass Project

Progress work

Material on site-RC pile

Cut off pile to the required level
Concreting work for base VBC

Thank you

Saturday, October 8, 2016

Kuala Terengganu By Pass

Kuala Terengganu By Pass project, awarded to G7 contractor from Kota Tinggi (ISWARABENA SDN BHD) The site possession was 27/8/2016.

The photos showed the progress of construction works.

Spun pile, Piling works
RC Sq pile,Piling Works
Site Clearance works


Don't be like ('_`)..mind your own business

Bior je...
Kite jadi penonton je...