Saturday, October 15, 2016

Progress KT By Pass

13/10/2016-15/10/2016

Fixing rebar for top slab vbc
Fixing rebar and formwork at vbc wingwall
Rc pile driven for pile embankment 
Installation of pipe culvert
Site clearance
Bar bending machine
Stockpile and fabrication rebar area

Tuesday, October 11, 2016

Progress work at KT by Pass

11/10/2016

Preparing for lean concrete abutment 

Stock pile sand
Fabrication area
Driven spun pile.
Prepare for concreting work wall of vbc
Compaction works for crusher run
Prepare for concreting works

Monday, October 10, 2016

Progress Work. KT By Pass

Progress on 10/10/2016
for project KT By Pass

Cut off pile to required level

Lean concrete at wing wall area.
Excavation at VBC wing wall
Apply curing compound
Site clearence and sand replacement

Thank you.

Progress photos BBR2.

10/10/2016

Cutting off pile
PVD works
Detention pond in progress
Installation of RCP culvert.

Sunday, October 9, 2016

Project BBR2,Earthworks & Detention Pond.

The client : Sime Darby USJ Sdj Bhd
Contractor: Iswarabena Sdn Bhd
Site Possession Date: 14/6/2016

ESCP 
Earth drain from sediment basin to discharge outlet
Laying geotextile & approved beach sand works for soil improvement
Soil improvement works..
Prefabricated Vertical Drain Works (PVD)
1st layer of earthfill works
Piling works..
RC pile 

KT By Pass Project

Progress work

Material on site-RC pile

Cut off pile to the required level
Concreting work for base VBC

Thank you

Saturday, October 8, 2016

Kuala Terengganu By Pass

Kuala Terengganu By Pass project, awarded to G7 contractor from Kota Tinggi (ISWARABENA SDN BHD) The site possession was 27/8/2016.

The photos showed the progress of construction works.

Spun pile, Piling works
RC Sq pile,Piling Works
Site Clearance works


Don't be like ('_`)..mind your own business

Bior je...
Kite jadi penonton je...