13/10/2016-15/10/2016
Fixing rebar for top slab vbc
Fixing rebar and formwork at vbc wingwall
Rc pile driven for pile embankment
Installation of pipe culvert
Site clearance
Bar bending machine
Stockpile and fabrication rebar area
13/10/2016-15/10/2016
11/10/2016
Progress on 10/10/2016
for project KT By Pass
The client : Sime Darby USJ Sdj Bhd
Contractor: Iswarabena Sdn Bhd
Site Possession Date: 14/6/2016
Progress work
Kuala Terengganu By Pass project, awarded to G7 contractor from Kota Tinggi (ISWARABENA SDN BHD) The site possession was 27/8/2016.
The photos showed the progress of construction works.